Gate Install · Greencastle, IN · September 2026

AutoGate Lift Gate Installation

A self-storage facility in Greencastle needed a new vertical lift gate at its main entry. SMS delivered the operator and panel on our own trailer, set everything with our own equipment, and handled the install from unloading to battery backup.

AutoGateVertical Lift Gate
20 ftGate Panel
Greencastle, INSelf-Storage Facility
Sept 29, 2026Install Date

The Project

Why a vertical lift gate

A vertical lift gate raises straight up instead of sliding or swinging, so it doesn't need side clearance, a long rail run, or room to swing into the drive. It's a strong fit for storage entries with tight lanes. The operator does the lifting from a single cabinet on the pad, which also keeps the service point in one place.

The customer poured a new concrete pad for the operator. SMS brought the gate package and equipment to the site and handled the installation.

How the install went

  1. SMS crew unloading gate equipment from the trailer with a track loader

    01Unload with our own equipment

    The operator, gate panel and a compact track loader came in on one trailer. The crew released the load, drove the loader off with a spotter, and used it to rig and lift each piece so nobody had to hand-carry heavy components.

  2. Track loader carrying the gate panel to the entry lane

    02Move the panel and operator to the lane

    The panel and operator were carried low and slow to the entry, with the crew guiding each load into place.

  3. AutoGate operator being set on the new concrete pad

    03Set the operator on the pad

    The loader set the operator onto the new concrete pad, and the crew lined it up with the gate opening before releasing the load.

  4. SMS technicians anchoring the gate operator base to the concrete pad

    04Drill and anchor

    With the position confirmed, the crew drilled the pad and anchored the operator base so it stays put through years of daily cycles.

  5. Technician mounting the lift gate panel to the operator

    05Mount and align the panel

    The 20-foot panel was brought in to the operator, fastened, and checked for alignment along its full length so it lifts square.

  6. AutoGate lift gate operator cabinet installed at the storage entry

    06Battery backup and close-up

    Backup batteries went into the operator cabinet so the gate keeps running during a power loss. The cabinet was closed up, and the manual and spare hardware were left on site for the facility.

What operators get with SMS

Our crew, our equipment

We bring the trailer, the track loader and the people. You don't have to rent equipment, hire a crane, or coordinate a second contractor.

Built to be serviced

The same team that installs your gate services it. We set operators and panels up so the next service call is fast and simple.

Storage-facility focused

We've worked on self-storage gates, access control, cameras and doors since 1997, so we plan around tenant traffic and access control from day one.